Consultancy works for Nauvata Engineering Pvt ltd

Trenching and Backfilling works for 20 Inch gas export pipeline for NELP Block KG-DWN 98/2 of ONGC

Providing Specialist advice on Dredging works at Ports – Ramayapatnam Port and Kakinada Gateway Port

Providing advice on dredging strategy

Determination of dredger capacities

Analyze soil results and prepare soil profiling for suitability of dredgers

Sourcing of Dredgers in International market

Analyzing refurbishment cost of Dredgers

Coordinating with the Seller of the Dredgers and engaging them during the entire process of coordination and evaluation of the respective dredgers

Preparation of detailed CAPEX and OPEX expenditure

Presenting final dredge strategy

Major Projects Completed

Technical advisory services for end to end management of Temporary Structre proposed at UTCL Jetty:

Project management consultancy for the installation of temporary structure for connecting the land with jetty, for conveying cement and limestones. Exploring various methodologies, evaluate the status, risk and cost analysis

Project 1:

Project Management and monitoring of Dredging of the berth pocket and the inner channel for their captive jetty at Jafarabad, Gujarat using (WID) Water Injection dredger.

Project 2:

Project Management Consultancy of Maintenance Dredging of their captive berth of Gujarat Cement Works berth at Kovaya, Rajula, Gujarat.

Works for both the projects included preparation of tender documents, negotiating with the dredging contractor and monitoring of daily dredging progress and daily quantities dredged by carrying our frequent hydrography surveys.

Offshore Trenching Works for Water intake and Outfall Pipeline

Project Management Consultancy, Evaluation & assessment, Planning methodology for execution of the trenching project, Pre, Post & Interim Surveys and quantity calculations, Preparation of Interim bills, Monitoring progress, Environmental Management & Contract Management. The above works carried out for M/s Yojaka India Pvt. Ltd who was the Sub-Contractors for MRPL, VA Tech Wabag being the main contractor.

Gopalpur ports Ltd

Dredging of approach channel and turning circle and Berth Pocket area.Capital Dredging in front of New Berths, Reclamation and Beach Nourishment.

Project Management Consultancy, Project Engineering, Evaluation & assessment, Developing Contract Document, quantity calculations & certifying quantities, Engineer of the project.

Capital Dredging - Quantities: 7.0 Million CuM

Project:

Dredging and offshore disposal for formation of approach channel, turning basin for RO-RO terminals at Dahej and Gogha - Gujarat

Project Management Consultancy, Project Engineering, Evaluation & assessment, Developing Contract Document, Calling of International Bids & Evaluating Bids, Selection of Dredging Contractor, Pre and Post Surveys quantity calculations & certifying quantities, Engineer of the project, Monitoring Reclamation works, Environmental Management and mitigating risks, Contract Management.

Capital Dredging - Quantities: 3.8 Million CuM

Project Cost: 192 Crore

Project:

Dredging and Reclamation works of main channel and mooring area for the FSRU at new greenfield port promoted by SWAN Energy at Jaffrabad, Gujarat.

Project Management Consultancy, monitoring of Dredging and Reclamation works, Hydrography Survey & quantity calculations and certification.

Capital Dredging – Estimated Quantity: 8.0 Million CuM.

Project:

Dredging and Reclamation works. Dredging in front of new container terminal and coal berth 3 & 4

Project Management Consultancy, Project Engineering, Evaluation & assessment, Developing Contract Document, Calling of International Bids & Evaluating Bids, Selection of Dredging Contractor, Pre and Post Surveys quantity calculations & certifying quantities, Engineer of the project, Monitoring Reclamation works, Environmental Management and mitigating risks, Contract Management.

Capital Dredging - Quantities: 10.0 Million CuM

Project cost: Rs. 280 Crore

Project:

Dredging and Reclamation works. Dredging of new berths, deepening of existing berths Project Management Consultancy. Pre and Post Surveys quantity calculations & certifying quantities, Engineer of the project, Monitoring Reclamation works, Environmental Management and mitigating risks, Contract Management.

Capital Dredging Quantity: 1.67 Million CuM of Rock Dredging

Project:

Capital Dredging works for deepening of channel and turning basin Providing manpower for monitoring of Dredging and Survey works for the Capital Dredging works for deepening of channel and turning basin

Capital Dredging Quantity: 13.7 Million CuM

Project Cost INR 288Cr.

Project:

Assisting in the bidding process for an International Green Field Port Development Project in far East Asia. Evaluation & assessment & Estimation for bid submission, Method statement, assessing requirement of Geotechnical and Geophysical investigation works, assessment offers sub-contracting dredging works

Capital Dredging Quantity: 17 Million CuM Reclamation quantities 5 M CuM

Identified suitable dredger to carry out trenching for laying of cooling water out fall pipes. Assisted in the charter party agreement between the client and the dredging contractor. Provided manpower for the monitoring the progress of the trenching

Trench Length: 1,800 m

Project:

Capital Dredging Phase II AtKamarajar Port.

Project management consultancy, Developing Contract Document, Calling of International Bids & Evaluating Bids, Selection of Dredging Contractor, Pre and Post Surveys and certifying quantities, Interim Surveys, quantity calculations & certification, Monitoring Dredging and Reclamation works, Environmental Management and mitigating risks, Contract Management,

Capital Dredging Quantity: 10.0 Million CuM

Project Cost INR 2010 Million. (45 USD Million)

Project:

Deepening and Widening of Mumbai Harbour and JN Port Channel

Project management consultancy, Assisting Evaluation and assessment, Preparing recommendations for Ministry and PIB, Developing Contract Document, Calling of International Bids and Evaluating Bids, Pre and Post Surveys and quantity calculations & Certification, Monitoring Dredging, Environmental Management and mitigating risks, Contract Management.

Capital Dredging Quantity - 61.25 M CuM of Soft Material, 0.5 M CuM of Rock

Project Cost INR 14500 Million (280 USD Million)

Project:

Feasibility Study for straightening of Creek for maintaining water flow equivalence and protection of banks including protection of Port land from erosion

Project:

capital dredging at the LNG terminal, Kochi.

Project Management Consultancy, Project involves in planning of the dredging operations and monitoring the progress of the TSHD and the CSD works.

Capital Dredging Quantity: 1.6 Million CuM

Project:

capital dredging at the LNG terminal, Kochi.

Capital Dredging works for expansion of Gangavaram Port India.

Project Management Consultancy, Project planning, estimation, assisting in bidding process, project scheduling, negotiations, site planning.

Capital Dredging Quantity: 3.60 Million CuM

Capital Dredging:

Setting up monitoring procedures and monitoring of TSHD on Daily Charter with JSW-JPL for maintenance dredging works in the channel for about 700,000 m3.

Project:

Dredging & Reclamation for formation of Platform for Fertilizer Plant

Project Management Consultancy, Project Engineering, Evaluation and assessment, Developing Contract Document, Calling for Bids and Evaluating Bids, Selection of Dredging Contractor.

Capital Dredging Quantity: 4.5 M CuM.

Project Cost INR 2770 Million

Offshore Trenching Works for Oil Pipeline:

Project Management Consultancy, Evaluation & assessment, Planning methodology for execution of the trenching project, Pre, Post & Interim Surveys and quantity calculations, Preparation of Interim bills, Monitoring progress, Environmental Management & Contract Management.

WID Construction Consultancy:

Consultancy during construction of WID at Shoft Shipyard for construction of WID Bar and dredging monitoring and positioning system

Chartering of Dredger:

Assisting in Chartering Trailer Suction Hopper Dredger for maintenance dredging works in Dhamra Port

Maintenance Dredging:

Project Management Consultancy for Maintenance Dredging, Monitoring Dredging & Hydrography Survey

Capital Dredging:

Dredging & Reclamation for Shipyard and Port Complex at Katupalli

Project management consultancy, Contract management, Checking of Pre and Post Levels, Quantity calculations & certification, monitoring of dredging and reclamation works, Environmental Management and mitigating risks,

Capital Dredging Quantity: 8.2 Million CuM

Project Cost INR 1740 Million

Feasibility Study:

Feasibility Study for Procurement of Dredger for Maintenance Dredging in Dhamra Port