1 Shoft Shipyard 2015

Project:Construction of Cutter Suction Dredger Consultancy in integrating various dredging components, like hydraulics, logic controls, Winches

Consultancy

Completed

2 Shoft Shipyard 2012-13

Project: Construction of Water Jet Injection Dredger (WID) Consultancy in integrating WID bar and position fixing.

Consultancy

Completed

3 L&T Shipbuilding 2012

Project: Construction of special design dredger to dredge under the ship lift facility where the accessibility was very limited

Consultancy

Completed

4 Mercator Limited 2014

Project: Pre purchase inspection of 3 TSHDs, Sea trials of the 3 TSHDs purchased, Consultancy for modifications and up gradation of dredging instrumentation on board the dredgers. Attending Drydocking in China

Consultancy

Completed

5 Navayuga Engineering Company 2007-08

Project: Pre purchase inspection of 2 TSHDs, Sea trials of the 2 TSHDs purchased, Consultancy for modifications and up gradation of dredging instrumentation on board the dredgers.

Consultancy

Completed